Projects per year
Abstract
The documentation of the tunneling process is a crucial task of every tunnel construction project. It provides evidence of the work performed and thus, serves as a basis for invoicing and for several further analyses. Therefore, continuous digitalisation of this documentation is essential. For this purpose, we provide a digital Tunneling Information Management System (TIMS), which is a prototypically implemented software tool for replacing the still common paper-based documentation process of tunneling projects using the New Austrian Tunneling Method (NATM). The data model presented here defines the data structures managed by this tool. Based on this, the software architecture and the implementation of TIMS is shown.
| Original language | English |
|---|---|
| Pages (from-to) | 259-264 |
| Number of pages | 6 |
| Journal | Geomechanics and Tunnelling |
| Volume | 15 |
| Issue number | 3 |
| DOIs | |
| Publication status | Published - Jun 2022 |
Fields of science
- 102006 Computer supported cooperative work (CSCW)
- 102015 Information systems
- 102016 IT security
- 102020 Medical informatics
- 102022 Software development
- 102027 Web engineering
- 102034 Cyber-physical systems
- 509026 Digitalisation research
- 502032 Quality management
- 502050 Business informatics
- 503015 Subject didactics of technical sciences
JKU Focus areas
- Digital Transformation
Projects
- 1 Finished
-
TransIT - Plattform zur digitalen Transformation im Tief- und Tunnelbau
Vierhauser, M. (Researcher) & Wimmer, M. (PI)
01.04.2020 → 31.12.2024
Project: Funded research › Federal / regional / local authorities